Angel City Q4 takeover — special rotate WOW Media MC-111 · I-405 San Diego Fwy NB @ Venice Blvd
plans needed: no → yes · takedown date: — → Oct 2 · additional notes: — → LADOT window 09:00-15:00 — crane staged by 08:00 or the day … · estimate provided: no → yes · fabrication materials: — → Oversize 3D extension package: foam-and-steel armature, prin… · estimated time on site: — → Full day — two crews, crane till mid-afternoon · traffic control needed: no → yes · estimated fabrication time: — → 10
permit note: — → LADOT temporary lane-closure permit filed for the 09:00–15:0… · permit status: none → applied
plans needed: no → yes · permits required: no → yes
notes: — → Extension fab underway at the shop. LADOT window is the whol…